Description | TIF funds used for land acquisition, architecture and engineering fees, general and administrative fees, contingency, site prep/earthwork and demolition, public improvements (sidewalks, pedestrian plaza corridor, and improvements and street extensions) needed in the rehabilitation of an existing building that will be expanded with a second floor addition, with proposed uses to include a first-floor multi-purpose event space with approximately 5,000 square feet, and a second-floor, full-scall restaurant and bar space with outdoor patio area. |